Recently completed jobs by Healthy Way Waterproofing & Mold Remediation

October 13, 2025 | Wayne, NJ
Healthy Way proposed a partial water management system that includes the installation of a sump pump. The remediation plan also involves fogging the affected areas with Vital Oxide disinfectant, providing remodeling services and installing an Aprilaire E50 dehumidifier to help maintain optimal, humidity levels and prevent future moisture issues.

October 13, 2025 | Wayne, NJ
Healthy Way proposed a partial water management system that includes sump pump. We also proposed completely gutting, all areas impacted by mold and water damage, along with fogging the affected areas with Vital Oxide disinfectant to ensure thorough and long lasting remediation.

October 10, 2025 | Livingston, NJ
Healthy Way proposed a partial water management system that includes the installation of a sump pump and a battery backup pump with Wi-Fi monitoring system. Additionally, the proposal includes painting, all foundation walls with Drylok Extreme mold resistant waterproofing paint to help prevent future moisture intrusion and improve the overall ...

October 9, 2025 | Spring Lake, NJ
Healthy Way proposed a partial water management system that includes installing a speedy drain, painting all foundation walls with Drylok Extreme Mold Resistant Waterproofing paint, relocating the existing pump to the interior of the basement, and installing a new battery backup pump with Wi-Fi monitoring system. The proposal also includes ...

October 4, 2025 | South Amboy, NJ
Healthy Way proposed a comprehensive full water management system that includes the installation of a sump pump along with a four step mold sanitization process. The scope of work also includes abatement and removal of all fiberglass insulation, followed by remodeling and installation of new insulation to restore the area ...

October 4, 2025 | Point Pleasant Beach, NJ
Healthy Way proposed a comprehensive five step mold mediation plan addressing all affected areas of the property. The scope of work includes cutting and removing of all interior walls, tile floors and ceilings down to the wood studs as well as removing carpeting. A full remediation process will be performed ...

October 2, 2025 | Warren, NJ
Healthy Way proposed a full water management system, which includes the installation of a sump pump and battery backup pump with Wi-Fi monitoring system as well as an Aprilaire E50 dehumidifier to maintain proper humidity control. In addition, Healthy Way will perform a comprehensive mold, sanitization process, including fogging with ...

October 2, 2025 | Princeton, NJ
Healthy Way conducted mold testing and confirmed the presence of mold on the cinderblock walls. To address the issue Healthyway proposed a partial water management system that includes the installation of a sump pump and a battery backup pump with Wi-Fi monitoring system. Additionally, we recommended a four step mold, ...

October 1, 2025 | Sayerville, NJ
Healthy Way proposed a comprehensive full water management system that includes the installation of a sump pump a battery backup pump with Wi-Fi monitoring system and additional measures to protect against future water intrusion. The proposal also includes a complete mold sanitization process featuring HEPA vacuuming, fogging of the affected ...

October 1, 2025 | Forked River, NJ
Healthy Way proposed a partial water management system, which includes the installation of a new sump pump and battery backup pump with Wi-Fi monitoring system to ensure continuous operation and protection against water intrusion. The proposal also includes drainage improvements in the exterior garden area to redirect surface water away ...
Total: 710