Recently completed jobs by Healthy Way Waterproofing & Mold Remediation
October 15, 2025 | Wall Township, NJ
Healthy Way proposed a five step mold mediation process on the foundation, sub flooring, and floor joists. The process includes fogging the area with vital oxide disinfectant, abating all fiberglass insulation and completing the project with remodeling services that include the installation of new insulation for a fully restored and ...
October 15, 2025 | Point Pleasant Beach, NJ
Healthy Way proposed a full waterproofing and mold remediation plan to provide a cleaner, dryer, and healthier home environment. The plan includes the installation of a sump pump as well as an Aprilaire E70 dehumidifier to control, moisture and maintain optimal indoor air quality. To protect the foundation, we ...
October 14, 2025 | Berkley Heights, NJ
Healthy Way proposed a full water management system, which includes the installation of a french drain, sump pump, a battery backup pump with Wi-Fi monitoring, and a smart outlet for enhanced protection and monitoring. The proposal also includes comprehensive abatement and remodeling surfaces to restore the affected areas to a ...
October 14, 2025 | Denville, NJ
Healthy Way proposed a five step mold remediation process on all subflooring, floor joists and wood surfaces throughout the crawlspace. The scope of work includes abatement of insulation and all other materials affected by mold, followed by remodeling and installation of new insulation. Additionally, Healthy Way recommended the installation of ...
October 13, 2025 | Wayne, NJ
Healthy Way proposed a partial water management system that includes the installation of a sump pump. The remediation plan also involves fogging the affected areas with Vital Oxide disinfectant, providing remodeling services and installing an Aprilaire E50 dehumidifier to help maintain optimal, humidity levels and prevent future moisture issues.
October 13, 2025 | Wayne, NJ
Healthy Way proposed a partial water management system that includes sump pump. We also proposed completely gutting, all areas impacted by mold and water damage, along with fogging the affected areas with Vital Oxide disinfectant to ensure thorough and long lasting remediation.
October 13, 2025 | Hackensack, NJ
Healthy Way proposed abatement of the water damaged area to ensure the space is properly dried, cleaned and prepared for future protection against moisture issues. We also proposed a partial water management system, which includes the installation of a sump pump to help control, groundwater intrusion.
October 10, 2025 | Livingston, NJ
Healthy Way proposed a partial water management system that includes the installation of a sump pump and a battery backup pump with Wi-Fi monitoring system. Additionally, the proposal includes painting, all foundation walls with Drylok Extreme mold resistant waterproofing paint to help prevent future moisture intrusion and improve the overall ...
October 9, 2025 | Spring Lake, NJ
Healthy Way proposed a partial water management system that includes installing a speedy drain, painting all foundation walls with Drylok Extreme Mold Resistant Waterproofing paint, relocating the existing pump to the interior of the basement, and installing a new battery backup pump with Wi-Fi monitoring system. The proposal also includes ...
October 4, 2025 | South Amboy, NJ
Healthy Way proposed a comprehensive full water management system that includes the installation of a sump pump along with a four step mold sanitization process. The scope of work also includes abatement and removal of all fiberglass insulation, followed by remodeling and installation of new insulation to restore the area ...
October 4, 2025 | Point Pleasant Beach, NJ
Healthy Way proposed a comprehensive five step mold mediation plan addressing all affected areas of the property. The scope of work includes cutting and removing of all interior walls, tile floors and ceilings down to the wood studs as well as removing carpeting. A full remediation process will be performed ...
Total: 836
