Healthy Way proposed water management using their Sealed Wall and Floor Pressure Relief System with sump pump installation, along with removal and remodel services.
Healthyway proposed the 5-Step mold remediation process with removal and remodel services including plaster and lathe removal, drywall replacement, and clearance testing.
Healthyway proposed the 5-Step mold remediation process in the basement, along with removal and remodel services including insulation removal and replacement.
Healthyway proposed an exterior waterproofing system based on the home’s foundation layout, including sealing and drainage installation, along with removal and remodel services.
Healthyway proposed a basement waterproofing and water management system, including sump pump installation with battery backup and removal and remodeling services.
Upon inspection, Healthyway identified mold and moisture concerns. Healthyway proposed mold remediation using their 5-step process, including removal and remodeling services.