Recently completed jobs by Healthy Way Waterproofing & Mold Remediation

Job in Tinton Falls

May 3, 2022 | Tinton Falls, NJ

Healthy Way proposed water management services including installation of a TOPDRAIN water drainage system with a sump pump, along with removal and remodel services.

Job in Netcong

May 2, 2022 | Netcong, NJ

Healthy Way proposed water management services including a pressure relief system and sump pump, with removal and remodeling services.

Job in Denville

May 2, 2022 | Denville, NJ

Healthy Way proposed water management services using the Sealed Wall and Floor Pressure Relief System with sump pump and backup system, as well as removal and remodel services.

Job in Fair Haven

April 30, 2022 | Fair Haven, NJ

Healthy Way proposed mold remediation services for the crawlspace area with removal and remodel services.

Job in Wyckoff

April 29, 2022 | Wyckoff, NJ

Healthy Way proposed mold remediation services including a 3-step sanitization process with containment, as well as removal and remodel services.

Job in Clifton

April 28, 2022 | Clifton, NJ

Healthy Way proposed water management services including installation of a sealed wall and floor pressure relief system with sump pump, battery backup, exterior discharge with surface drain, and full dust and mold containment, with additional removal and remodel services.

Job in Bridgewater

April 27, 2022 | Bridgewater, NJ

Healthy Way proposed exterior waterproofing and mold removal services including excavation and sealing of the front foundation wall with a three-layer system, mold remediation of basement wood surfaces, and removal and remodel services.

Job in Red Bank

April 27, 2022 | Red Bank, NJ

Healthy Way proposed water management services including installation of a sealed wall and floor pressure relief system with a sump pump and discharge piping with removal and remodel services.

Job in Edison

April 27, 2022 | Edison, NJ

Healthy Way proposed basement water management services including a pressure relief system, sump pump, containment, and exterior drainage upgrades, with removal and remodeling services.

Job in Bridgewater

April 27, 2022 | Bridgewater, NJ

Healthy Way proposed water management and mold remediation services including sealed wall and floor pressure relief systems, sump pump, full dust and mold containment, and removal and remodel services.

Job in Verona

April 25, 2022 | Verona, NJ

Healthy Way proposed water management services including sealed wall and floor pressure relief systems, sump pumps with battery backup, full dust and mold containment, Speedy Drain, exterior underground discharge, Flo-Well with surface drain, and removal /remodel services.

Job in Ridgewood

April 22, 2022 | Ridgewood, NJ

Healthy Way proposed mold removal and water management services including 5-step mold remediation in the basement and crawlspaces, installation of a sealed wall and floor pressure relief system with primary and backup sump pumps, underground discharge connections, insulation, and associated removal and remodel service

Job in Lake Hiawatha

April 21, 2022 | Lake Hiawatha, NJ

Healthy Way proposed mold removal and foundation repair services including remediation of crawlspace wood surfaces, installation of dehumidifier and sump pump, crack sealing, and VaporBright encapsulation, with removal and remodel services.

Job in South Amboy

April 21, 2022 | South Amboy, NJ

Healthy Way proposed water management services including a sealed wall and floor pressure relief system with sump pump installation, with removal and remodel services.

Job in Clifton

April 20, 2022 | Clifton, NJ

Healthy Way proposed interior water management services for all foundation walls including sealed wall and floor pressure relief systems, sump pumps, VaporBright encapsulation, and removal and remodel services.