Recently completed jobs by Healthy Way Waterproofing & Mold Remediation

Job in Lakewood

February 10, 2022 | Lakewood, NJ

Healthyway proposed the 5-Step mold remediation process, including removal and remodel services such as drywall replacement and carpet removal.

Job in North Bergen

February 9, 2022 | North Bergen, NJ

Healthyway proposed basement waterproofing and mold remediation, including sump pump installation with battery backup, exterior drainage, and removal and remodeling services

Job in Millington

February 9, 2022 | Millington, NJ

Healthyway proposed water management services with two sump pumps and underground discharge, along with removal and remodel services. 

Job in Somerset

February 9, 2022 | Somerset, NJ

Healthyway proposed the TOPDRAIN Water Drainage System with sump pumps, along with removal and remodel services

Job in Edison

February 8, 2022 | Edison, NJ

Healthyway proposed a basement waterproofing and water management system, including sump pump installation with battery backup, interior and exterior drainage, and removal and remodeling services.

Job in Caldwell

February 8, 2022 | Caldwell, NJ

Healthyway proposed a water management system including drainage, sump pump installation, and exterior discharge solutions.

Job in Jersey City

February 8, 2022 | Jersey City, NJ

Healthyway proposed a water management system with 2 sump pumps and battery backup, as well as removal and remodel services.

Job in Livingston

February 7, 2022 | Livingston, NJ

Healthyway first inspected the home for foundation concerns and subsequently proposed a water management system, along with removal and remodel services.

Job in Montclair

February 7, 2022 | Montclair, NJ

Healthyway proposed a water management system as well as removal and remodel services, including drainage installation and  2 sump pumps. 

Job in Montville

February 4, 2022 | Montville, NJ

Healthyway proposed water management using their Sealed Wall and Floor Pressure Relief System with sump pump installation, along with removal and remodel services.

Job in Clifton

February 3, 2022 | Clifton, NJ

Healthyway proposed water management services using their TOPDRAIN system, sump pumps, and dehumidifier, along with removal and remodel services. 

Job in Asbury Park

February 2, 2022 | Asbury Park, NJ

Healthyway proposed a comprehensive basement waterproofing and water management system, including structural repairs with new footings and concrete floor, sump pump installation with battery backup, interior and exterior drainage. 

Job in Englewood

February 2, 2022 | Englewood, NJ

Healthyway proposed a basement waterproofing and water management system, including sump pump installation with battery backup, interior drainage, and removal and remodeling services.

Job in Elmwood Park

February 2, 2022 | Elmwood Park, NJ

Healthyway proposed a basement waterproofing and mold remediation system, including sump pump installation with battery backup, interior and exterior drainage, a dehumidifier and removal/ remodeling services. 

Job in Whiting

February 1, 2022 | Whiting, NJ

Healthyway proposed mold remediation using their 5-step process, including removal and remodel services such as insulation removal and replacement.