Recently completed jobs by Healthy Way Waterproofing & Mold Remediation

Job in Manalapan

January 13, 2022 | Manalapan, NJ

Healthyway proposed water management services including exterior drainages and a Flo-Well with surface drain.

January 13, 2022 | Bloomfield, NJ

Healthy Way proposed a mold remediation system using their 5-step process and drywall removal and replacement services. 

Job in Belle Mead

January 12, 2022 | Belle Mead, NJ

Healthyway proposed a basement waterproofing and water management system that includes interior French drains, multiple sump pumps, as well as mold remediation and removal/remodel services.

Job in Old Bridge

January 12, 2022 | Old Bridge, NJ

Healthyway proposed their 5-step mold remediation process along with removal and remodeling services.

January 11, 2022 | Emerson, NJ

Healthyway proposed mold removal, water management services, and removal and remodeling services, including installation of their TOPDRAIN water drainage system and sump pump with battery backup.

Job in Jersey City

January 10, 2022 | Jersey City, NJ

Healthyway proposed their 5-step mold remediation process and water management system along with removal and remodeling services.

Job in Roselle

January 10, 2022 | Roselle, NJ

Healthyway proposed a basement water management and waterproofing system, including sump pump, removal and remodeling services

Job in West Milford

January 10, 2022 | West Milford, NJ

Healthyway proposed a crawlspace waterproofing system featuring interior drainage, two sump pumps, a dehumidifier, and removal/ remodeling services.

Job in Perth Amboy

January 8, 2022 | Perth Amboy, NJ

Healthyway proposed interior water management and foundation repair services,  a sump pump, and removal/remodeling services.

Job in Brielle

January 8, 2022 | Brielle, NJ

Healthyway proposed a waterproofing system that includes interior French drains, dual sump pumps with battery backup, and outside drainage, as well as mold remediation services. 

Job in Somerville

January 7, 2022 | Somerville, NJ

Healthyway proposed a waterproofing and mold remediation system including a sump pump with battery backup, foundation repair services, and removal and remodeling services.

Job in East Hanover

January 6, 2022 | East Hanover, NJ

Healthyway proposed their 5-step mold remediation process along with removal and remodeling services, including installation of a dehumidifier.

Job in West Caldwell

January 6, 2022 | West Caldwell, NJ

Healthy Way proposed a basement water management system including a sump pump with battery backup, sealed wall and floor pressure relief system, and do remodeling/removal services.

January 5, 2022 | Berkeley Heights, NJ

Healthyway proposed a complete basement waterproofing system featuring interior French drains, dual sump pumps with battery backup, outside drainage, mold-resistant wall coating, and removal and remodeling services.

Job in Linden

January 5, 2022 | Linden, NJ

Healthyway proposed a mold remediation system including a 5-step mold remediation process, a dehumidifier, and removal and remodeling services.

Total: 781