Recently completed jobs by Healthy Way Waterproofing & Mold Remediation

Job in Union

January 31, 2022 | Union, NJ

Healthyway proposed their 5-step mold remediation process along with removal and remodeling services.

Job in Plainfield

January 31, 2022 | Plainfield, NJ

Healthyway proposed a basement waterproofing and water management system, including sump pump installation, exterior drainage, and removal and remodeling services. 

Job in Whippany

January 30, 2022 | Whippany, NJ

Healthy Way proposed the 5-Step Mold Remediation Process including removal of wall insulation and remodel services.

Job in Jersey City

January 29, 2022 | Jersey City, NJ

Healthyway proposed a basement waterproofing and foundation repair system including interior drainage, dual sump pumps with battery backup, outside drainage, and full wall encapsulation.

Job in Vauxhall

January 28, 2022 | Vauxhall, NJ

Healthyway proposed a mold remediation system for the crawlspace, including their 5-step process and removal/remodeling services. 

Job in Wayne

January 28, 2022 | Wayne, NJ

Healthyway proposed their 5-step mold remediation process along with removal and remodeling services.

Job in Middletown

January 27, 2022 | Middletown, NJ

Healthyway proposed interior water management services, two sump pumps, a dehumidifier, and removal and remodeling services.

Job in Haledon

January 27, 2022 | Haledon, NJ

Healthy Way proposed basement waterproofing with a sealed wall and floor pressure relief system, sump pump with battery backup, outside drainage, foundation repair services, and removal and remodel services.

Job in Englewood

January 27, 2022 | Englewood, NJ

Healthyway proposed a water management system including sump pumps with battery backup and foundation wall repairs to ensure a fully waterproofed basement.

January 26, 2022 | Whitehouse Station, NJ

Healthyway proposed a basement waterproofing and mold remediation system, a sump pump and battery, a dehumidifier, and removal/remodeling services.

Job in Middletown

January 26, 2022 | Middletown, NJ

Healthyway proposed a water management and mold removal system for the crawlspace, including their 5-step mold remediation process, and installation of a sump pump and dehumidifier.

Job in Verona

January 26, 2022 | Verona, NJ

Healthyway proposed water management including interior French drains, sump pumps with battery backup, and outside drainage to protect foundation walls on all sides.

Job in Livingston

January 25, 2022 | Livingston, NJ

Healthyway proposed their 3-layer waterproofing system and foundation repair services along with removal/remodeling services.

Job in Middletown

January 25, 2022 | Middletown, NJ

Healthyway proposed foundation repair services including installation of Rhino Carbon Fiber Strips. 

Job in North Bergen

January 25, 2022 | North Bergen, NJ

Healthyway proposed a waterproofing and mold remediation system including a 5-step mold remediation process and removal and remodeling services.