Recently completed jobs by Healthy Way Waterproofing & Mold Remediation

Job in Oak Ridge

June 15, 2022 | Oak Ridge, NJ

Healthy Way proposed foundation repair services including footing underpin, Rhino Carbon Fiber Strips, and preping and sealing cracks.

Job in Somerset

June 9, 2022 | Somerset, NJ

Healthy Way proposed a basement water management system including a French drain and sump pump, with removal and remodel services

Job in Edison

June 7, 2022 | Edison, NJ

Healthy Way proposed mold removal services using the 5-Step Mold Remediation Process for attic sheathing and rafters, with removal and remodel services.

Job in Long Branch

June 7, 2022 | Long Branch, NJ

Healthy Way proposed foundation repair and water management services including Rhino Carbon Fiber strips, footing underpin, and removal and remodel services.

Job in Neptune

June 6, 2022 | Neptune, NJ

Healthy Way proposed water management and basement waterproofing services using an exterior 3-layer waterproofing system with excavation and seal, with removal and remodel services.

Job in Montvale

June 4, 2022 | Montvale, NJ

Healthy Way proposed mold remediation services using the 5-Step Mold Remediation Process for foundation walls, including removal and remodel services.

Job in Manalpan

June 4, 2022 | Manalpan, NJ

Healthy Way proposed interior water management services using the TOPDRAIN Water Drainage System with sump pump and battery backup, along with dust/mold containment, a 3-step sanitization process, and full removal/remodel work. 

Job in North Bergen

June 2, 2022 | North Bergen, NJ

Healthy Way proposed basement water management services including a TOPDRAIN water drainage system with a sump pump, interior and exterior discharge piping, and dust/mold containment, along with removal and remodel services.

Job in Sayreville

June 1, 2022 | Sayreville, NJ

Healthy Way proposed water management services using the Sealed Wall and Floor Pressure Relief System with sump pumps and removal and remodel services

Job in Edison

June 1, 2022 | Edison, NJ

Healthy Way proposed water management and mold remediation services for the basement, including a sealed wall and floor pressure relief system with sump pump and exterior drainage, with removal and remodel services.

Job in Sayreville

June 1, 2022 | Sayreville, NJ

Healthy Way proposed a basement waterproofing system with a sealed wall and floor pressure relief system, sump pumps with interior discharge connecting to outside drainage, including removal and remodel services.

Job in Little Egg Harbor Twp

May 31, 2022 | Little Egg Harbor Twp, NJ

Healthy Way proposed crawlspace mold removal services including the 5-step remediation process, encapsulation, and insulation removal with remodeling services.

Job in Clifton

May 31, 2022 | Clifton, NJ

Healthy Way proposed water management services using the TOPDRAIN system with sump pump and backup system, as well as removal and remodel services.

Job in Long Valley

May 27, 2022 | Long Valley, NJ

Healthy Way proposed mold removal services for the attic using the 5-step remediation process with sanitization, including removal and remodel services.

Job in West Orange

May 26, 2022 | West Orange, NJ

Healthy Way proposed basement water management services including the sealed wall and floor pressure relief system with dual sump pumps, along with removal and remodeling services.