Recently completed jobs by Healthy Way Waterproofing & Mold Remediation

Job in Jersey City

June 23, 2022 | Jersey City, NJ

Healthy Way proposed basement water management services including a sealed wall and floor pressure relief system with sump pumps and battery backup systems, along with removal and remodel services. 

Job in Ledgewood

June 22, 2022 | Ledgewood, NJ

Healthy Way proposed water management and mold removal services using the Sealed Wall and Floor Pressure Relief System with sump pump, as well as the 5-Step Mold Remediation Process, including removal and remodel services.

Job in Colonia

June 22, 2022 | Colonia, NJ

Healthy Way proposed a basement waterproofing system as well as mold remediation services, including interior french drains and a sump pump with battery backup, with additional removal and remodel services.

Job in Edison

June 22, 2022 | Edison, NJ

Healthy Way proposed a 3-Layer Waterproofing System with outside drainage and a sump pump, including removal and remodel services.

Job in North Haledon

June 22, 2022 | North Haledon, NJ

Healthy Way proposed water management and mold remediation services including a basement interior French drain, a sump pump with battery backup, and removal and remodel services.

Job in Millington

June 21, 2022 | Millington, NJ

Healthy Way proposed mold remediation services including full containment with air scrubbers, with additional removal and remodel services.

Job in Howell

June 21, 2022 | Howell, NJ

Healthy Way proposed water management and mold remediation services including a sealed wall and floor pressure relief system with sump pump and dehumidifier, as well as removal and remodel services.

Job in Ledgewood

June 21, 2022 | Ledgewood, NJ

Healthy Way proposed water management and mold remediation services including a sealed wall and floor pressure relief system with sump pump, exterior drainage, and removal and remodel services.

Job in Metuchen

June 17, 2022 | Metuchen, NJ

Healthy Way proposed water management and mold remediation services including a Santa Fe dehumidifier tied into the sump pump and removal and remodel services.

Job in Oak Ridge

June 16, 2022 | Oak Ridge, NJ

Healthy Way proposed water management services using the Sealed Wall and Floor Pressure Relief System with sump pump, as well as removal and remodel services.

Job in Red Bank

June 16, 2022 | Red Bank, NJ

Healthy Way proposed water management and mold remediation services including a sealed wall and floor pressure relief system with sump pump, as well as removal and remodel services.

Job in Oak Ridge

June 15, 2022 | Oak Ridge, NJ

Healthy Way proposed foundation repair services including footing underpin, Rhino Carbon Fiber Strips, and preping and sealing cracks.

Job in Somerset

June 9, 2022 | Somerset, NJ

Healthy Way proposed a basement water management system including a French drain and sump pump, with removal and remodel services

Job in Edison

June 7, 2022 | Edison, NJ

Healthy Way proposed mold removal services using the 5-Step Mold Remediation Process for attic sheathing and rafters, with removal and remodel services.

Job in Long Branch

June 7, 2022 | Long Branch, NJ

Healthy Way proposed foundation repair and water management services including Rhino Carbon Fiber strips, footing underpin, and removal and remodel services.