Recently completed jobs by Healthy Way Waterproofing & Mold Remediation

Job in Metuchen

June 17, 2022 | Metuchen, NJ

Healthy Way proposed water management and mold remediation services including a Santa Fe dehumidifier tied into the sump pump and removal and remodel services.

Job in Oak Ridge

June 16, 2022 | Oak Ridge, NJ

Healthy Way proposed water management services using the Sealed Wall and Floor Pressure Relief System with sump pump, as well as removal and remodel services.

Job in Red Bank

June 16, 2022 | Red Bank, NJ

Healthy Way proposed water management and mold remediation services including a sealed wall and floor pressure relief system with sump pump, as well as removal and remodel services.

Job in Oak Ridge

June 15, 2022 | Oak Ridge, NJ

Healthy Way proposed foundation repair services including footing underpin, Rhino Carbon Fiber Strips, and preping and sealing cracks.

Job in Somerset

June 9, 2022 | Somerset, NJ

Healthy Way proposed a basement water management system including a French drain and sump pump, with removal and remodel services

Job in Edison

June 7, 2022 | Edison, NJ

Healthy Way proposed mold removal services using the 5-Step Mold Remediation Process for attic sheathing and rafters, with removal and remodel services.

Job in Long Branch

June 7, 2022 | Long Branch, NJ

Healthy Way proposed foundation repair and water management services including Rhino Carbon Fiber strips, footing underpin, and removal and remodel services.

Job in Neptune

June 6, 2022 | Neptune, NJ

Healthy Way proposed water management and basement waterproofing services using an exterior 3-layer waterproofing system with excavation and seal, with removal and remodel services.

Job in Montvale

June 4, 2022 | Montvale, NJ

Healthy Way proposed mold remediation services using the 5-Step Mold Remediation Process for foundation walls, including removal and remodel services.

Job in Manalpan

June 4, 2022 | Manalpan, NJ

Healthy Way proposed interior water management services using the TOPDRAIN Water Drainage System with sump pump and battery backup, along with dust/mold containment, a 3-step sanitization process, and full removal/remodel work. 

Job in North Bergen

June 2, 2022 | North Bergen, NJ

Healthy Way proposed basement water management services including a TOPDRAIN water drainage system with a sump pump, interior and exterior discharge piping, and dust/mold containment, along with removal and remodel services.

Job in Sayreville

June 1, 2022 | Sayreville, NJ

Healthy Way proposed water management services using the Sealed Wall and Floor Pressure Relief System with sump pumps and removal and remodel services

Job in Edison

June 1, 2022 | Edison, NJ

Healthy Way proposed water management and mold remediation services for the basement, including a sealed wall and floor pressure relief system with sump pump and exterior drainage, with removal and remodel services.

Job in Sayreville

June 1, 2022 | Sayreville, NJ

Healthy Way proposed a basement waterproofing system with a sealed wall and floor pressure relief system, sump pumps with interior discharge connecting to outside drainage, including removal and remodel services.

Job in Little Egg Harbor Twp

May 31, 2022 | Little Egg Harbor Twp, NJ

Healthy Way proposed crawlspace mold removal services including the 5-step remediation process, encapsulation, and insulation removal with remodeling services.