Recently completed jobs by Healthy Way Waterproofing & Mold Remediation

Job in Jersey City

November 18, 2022 | Jersey City, NJ

Healthy Way proposed a basement water management system including a sump pump with battery backup, interior PVC discharge piping, and removal and remodel services.

Job in Edison

November 17, 2022 | Edison, NJ

Healthy Way proposed mold remediation services using the 5-Step Mold Remediation process for basement concrete and wood surfaces, including removal and remodel services.

Job in Wayne

November 14, 2022 | Wayne, NJ

Healthy Way proposed mold remediation services including pre-testing (air and surface) as well as the 5-Step Mold Remediation service. 

Job in Brielle

November 12, 2022 | Brielle, NJ

Healthy Way proposed exterior waterproofing including excavate and seal for foundation walls with removal and remodel services.

Job in Middletown

November 10, 2022 | Middletown, NJ

Healthy Way proposed a basement water management system including interior french drains, a sump pump with battery backup, outside drainage, and remodeling/removal services

Job in Jersey City

November 8, 2022 | Jersey City, NJ

Healthy Way proposed mold remediation services as well as removal and remodel services.

Job in Point Pleasant Boro

November 7, 2022 | Point Pleasant Boro, NJ

Healthy Way proposed mold remediation services including the 3-Step Mold Sanitization Process, clearance testing, and remodeling/removal services.

Job in Oak Ridge

November 4, 2022 | Oak Ridge, NJ

Healthy Way proposed an exterior waterproofing system with excavate and seal services and remodeling/removal services.

November 2, 2022 | Sea Girt, NJ

Healthy Way proposed a basement water management system including a sump pump, exterior PVC underground discharge with flo-well, and removal and remodel services.

Job in Ridgefield

October 29, 2022 | Ridgefield, NJ

Healthy Way proposed a basement waterproofing system including interior french drains, a sump pump, and outside drainage with removal and remodel services.

Job in Brick

October 27, 2022 | Brick, NJ

Healthy Way proposed a basement water management system including interior french drains, dual sump pumps with a battery backup system, and removal and remodel services.

Job in Freehold

October 26, 2022 | Freehold, NJ

Healthy Way proposed a basement water management system including interior french drains, sump pump with battery backup, outside drainage, and removal and remodel services.

Job in East Orange

October 25, 2022 | East Orange, NJ

Healthy Way proposed a basement water management system including a sump pump with battery backup  and mold remediation services.

Job in West Orange

October 24, 2022 | West Orange, NJ

Healthy Way proposed the 5-step mold remediation service in the crawlspace and insulation removal and replacement. 

Job in Hasbrouck Heights

October 24, 2022 | Hasbrouck Heights, NJ

Healthy Way proposed a basement waterproofing system including interior french drains, a sump pump with battery backup, outside drainage, and removal and remodel services.