Job completed for Job in Washington
Completion date: November 4, 2025
Location: Washington, NJ
Why did the customer contact us?
Daniel reached out to Healthy Way for an attic mold inspection.
Solutions provided:
Healthy Way has proposed a comprehensive remediation and insulation upgrade, which includes abating all drywall in the attic and the exterior walls of the finished basement. The scope also covers removing all existing fiberglass insulation from the attic finished area, the exterior basement walls and the ceilings in multiple rooms. Healthyway will also remove ceiling tiles as needed and install high density spray foam insulation throughout the attic, the exterior basement walls in the finished area, and the affected ceilings, ensuring improved comfort, energy, efficiency, and long-term, protect protection.
